Completed Projects in UNITED ARAB EMIRATES (U.A.E.) |
||||
Item No. | Description | Client | Consultant | Date |
1 | Topographical Survey, and underground detection survey works (facility areas and flowlines )for BAHASA TIE-INS(2021-2025) PACKAGE1 | ADNOC | China Petroleum Pipeline Engineering Co., Ltd. (CPPE) | January 2022 to April 2022 |
2 | Topographic Survey Work for Benchmark Verification & Permanent Control Point of Etihad Rail Network Project-Package 2B, 2C & 2D -UAE | Etihad Rail Company
CRCC NPC JV CRCC GTGC JV |
Jacobs | May 2021 to April 2022 |
3 | Office Building for Embassy of the People’s Republic of China | Embassy of the People’s Republic of China | Amar Golden & Chinese Beijing Design Institute | December 2020 to March 2021 |
4 | Topographical Survey, Geophysical Survey & Geotechnical Investigation for Replacement of MOL 1.2 & 3.5 Pipeline | ADNOC | China Petroleum Pipeline Engineering Co., Ltd. (CPPE) | January 2021 to November 2021 |
5 | Topographical Survey of Etihad Rail Network Project-Package 2B & 2C – Dubai & Abu Dhabi-U.A.E. | CRCC GTGC JV | Jacobs | August 2019 to March 2020 |
6 | Geophysical Survey & Geotechnical Investigation of Etihad Rail Network Project-Package 2D – Fujairah-U.A.E. | CRCC NPC JV | Jacobs | January to December 2020 |
7 | Pilling works for Construction of KPO Marine Bridge-Freight facilities 2F2 Khalifa port Marine Bridge
Stage 2 Etihad Network |
Etihad Rail Company
Power Construction Corporation of China Ltd -Dubai Branch |
Jacobs | March to October 2021 |
8 | Temporary Site Facility Supply and Construction & Topographical Survey for UAE Wind Program | Power Construction Corporation of China Ltd -Abu Dhabi Branch | Feb to April 2022 | |
9 | Soil Backfilling Project for KIZAD Industry | China Railway International Group Co Ltd-Abu Dhabi | Chinese Consultant Company | June to November 2021 |
10 | Dynamic Compaction and Piling Construction for CSP Abu Dhabi Khalifa Port Container Freight Station Project | COSCO-SHIPING &
China Harbour Engineering Co,LLC |
China Petroleum Pipeline Engineering Corp.(CPPE) | August to December 2019 |
11 | PT1 Micropile construction Work for Dubai 700MW CSP+2550MW PV Hybrid IP Project B1
& PV Component Support Foundation Construction for Noor Energy 1-700MW CSP Project Mohammad Bin Rashid Maktoum Solar Park Dubai-UAE |
Shanghai Electric Corporation &
The Second Construction Co, Ltd of China Construction Third Engineering Bureau (Dubai Branch) & China Energy Engineering Group Tianjin Electric Power Construction Co, Ltd (Dubai Branch) |
Feb 2020 to Oct 2021 | |
12 | Construction of Battery Recycling Factory | Chunxing Resource Industries Ltd. | Jiangsu Design | June to Sep 2020 |
13 | Topographical Survey Geophysical Survey & Geotechnical Investigation for Proposed Office Building of Consulate-General of People’s Republic of China in Dubai | Consulate-General of People’s Republic of China in Dubai | China International Engineering Design & Consult Co. Ltd ; Pioneers of Experts
Engineering Consultant |
February to March 2018 |
14 | Topographical Survey, Geophysical Survey & Geotechnical Investigation for CHINA-UAE Industrial Capacity Production Cooperation Demonstration Park | CHINA-UAE Industrial Capacity Cooperation (Jiangsu) Development and Management Ltd | China Petroleum Pipeline Engineering Corp.(CPPE) | March
to July 2018 |
15 | Dewatering works for Dubai Aluminum Cooling Pipe Line For H-Class Combined Cycle Power Plant ,
Emirates Global Aluminum Company Limited |
SEPCOIII Electric Power Construction CO.LTD-Abu Dhabi | SIEMENS & SEPCOIII | April 2021 to November 2021 |
16 | Dewatering 、Shoring 、Anchoring 、Piling and Excavation
for Proposed Consulate- Building (2B+G+2F+R)on Plot NO 3140159 at Umm Hurair First , Dubai. |
Consulate-General of People’s Republic of China in Dubai
EPC Contractor: China Civil Engineering Construction Corporation(CCECC) |
Pioneers of Experts (POE)
& China international Engineering Design & Consult Co, LTI |
June to Dec 2020 |
17 | Dewatering works for Taweelah 200MIGD RO
Independent water project Abu Dhabi |
SEPCOIII Electric Power Construction CO.LTD-Abu Dhabi | ILF Consulting Engineers | Feb 2020 to December 2021 |
18 | Dewatering works for CHINA-UAE Industrial Capacity Cooperation Demonstration Zone road and infrastructure Utilities Phase I | China Jiangsu International Economic and technical Cooperation group Ltd -Abu Dhabi | China Petroleum Pipeline Engineering Corp. (CPPE) | January
to April 2020 |
19 | Soil Backfilling, Testing and Topo survey for KIZAD Life Science Park Phase-I Project (Sinopharm Plant)
国药集团阿布扎比疫苗厂项目 |
CNBG & G42
中国生物技术股份有限公司(国药疫苗工厂) EPC Contractor: China State Construction Engineering Corporation (Middle East)(LLC) |
Consultant and PMC: Engineering Consultant Group .S.A
(ECG) Design Consultant : China Aviation Planning and Design Institute (Group) CO,LTD |
June 2021 to April 2022 |
20 | Soil Investigation and Civil Work Construction of Container’s Scanner System for Abu Dhabi Airport
AC6015XN Scanning System
|
Abu Dhabi Customs Authority & NUCTECH Company Limited | COTECNA Inspection S.A., Switzerland | May to Oct 2011 |
21 |
Geotechnical Investigation and Topographical Survey for Abu Dhabi Crude Oil Pipeline Project (Habshan- Fujairah)
|
International Petroleum Investment Company (IPIC)
EPC Contractor: CPECC & CPP |
ILF Consulting Engineering & PENSPEN | May, 2008 to
October, 2009 |
22 | Geophysical Survey Project for Main Oil Terminal (MOT) of Abu Dhabi Crude Oil Pipeline Project (Habshan – Fujarah) | International Petroleum Investment Company (IPIC)
EPC Contractor: CPECC & CPP |
ILF Consulting Engineering &
PENSPEN |
Feb 2009 to July 2009 |
23 | Geophysical Survey for Determining Water Well Location for IPS Station of Abu Dhabi Crude Oil Pipeline Project (Habshan – Fujarah) | International Petroleum Investment Company (IPIC)
EPC Contractor: CPECC & CPP |
ILF Consulting Engineering &
PENSPEN |
February, 2009 |
24 | Water Well Drilling and Testing Project for IPS Station of Abu Dhabi Crude Oil Pipeline Project (Habshan – Fujarah) | International Petroleum Investment Company (IPIC)
EPC Contractor: CPECC & CPP |
ILF Consulting Engineering &
PENSPEN |
August, 2009 |
25 | Topographic Survey, Geotechnical Investigation, Geophysical Survey for CEMEX UAE Cement Grinding Facility Project | EPC Contractor: SINOMA-CDI 10000 T/D | May to October 2009 | |
26 | Topographic Survey, Geotechnical Investigation,
Geophysical Survey for ABMC Cement Plant |
EPC Contractor: SINOMA-CDI
10000 T/D |
2007-2008 | |
27 |
Topographic Survey, Geotechnical Investigation, Geophysical Survey for (UCC) Union Cement Company
|
EPC Contractor: SINOMA-CDI 10000 T/D | 2010 | |
28 | Abu Dhabi Sewerage Scheme Khalifa City (B) Ground Conditions Program Geophysical Surveys (Phase 2) | Sewerage Projects
Committee, Abu Dhabi |
Hyder Consulting
Middle East Ltd. |
September, 1999 |
29 |
Abu Dhabi Sewerage Scheme Khalifa City (B) Ground Conditions Program Geophysical Surveys (Extension of Phase 2)
|
Sewerage Projects
Committee, Abu Dhabi |
Hyder Consulting
Middle East Ltd. |
March, 2000 |
30 |
Abu Dhabi Sewerage Scheme Khalifa City (B) Ground Conditions Program Geophysical Surveys ( Phase 3) |
Sewerage Projects
Committee, Abu Dhabi |
Hyder Consulting
Middle East Ltd. |
June, 2000 |
31 | Abu Dhabi Sewerage Scheme Khalifa City (B) Ground Conditions
Program Geophysical Surveys ( Extension to Phase 3) |
Sewerage Projects
Committee, Abu Dhabi |
Hyder Consulting
Middle East Ltd. |
December, 2000 |
32 | Abu Dhabi Sewerage Scheme Khalifa City (B) Ground Conditions
Program Geophysical Surveys ( Mussafah East) |
Sewerage Projects
Committee, Abu Dhabi |
Hyder Consulting
Middle East Ltd. |
January, 2001 |
33 | Al Shamkha ADSS Contract 720 Area Geophysical Surveys | Sewerage Projects
Committee, Abu Dhabi |
Hyder Consulting
Middle East Ltd. |
May, 2002 |
34 | Amiri flight Airfield Expansion Geophysical Survey | Arab Center for Engineering
Studies |
Halcrow International
Partnership |
March, 2003 |
35 | ADSS Contract 160/3 Miscellaneous Ground Investigation Works-Phase 3 | Sewerage Projects
Committee, Abu Dhabi |
Hyder Consulting
Middle East Ltd. |
June, 2003 |
36 | ADSS Contract 160/4 Miscellaneous Ground Investigation Works-Phase 4 | Sewerage Projects
Committee, Abu Dhabi |
Hyder Consulting
Middle East Ltd. |
May, 2005 |
37 | Abu Dhabi University New Campus Geophysical Investigation | ADU, Abu Dhabi | Arkonsult | May, 2005 |
38 | Expansion of Abu Dhabi International Airport Rough Grading Contract Geophysical | Saif Bin Darwish | Parsons and Halcrow | June, 2006 |
39 | Abu Dhabi Sewerage Scheme Contract No.222 Main Gravity Sewers Network at Khalif Bin Zayed City – Phase 3 Geophysical Survey
|
Sewerage Projects Committee, Abu Dhabi | Hyder Consulting Middle East Ltd. |
June, 2006 |
40 | Expansion of Abu Dhabi International Airport New 2k Runway-Main Runway Geophysical Survey | Saif Bin Darwish | Parsons and Halcrow | June, 2006 |
41 | Expansion of Abu Dhabi International Airport Rough Grading Contract Geophysical | Odebrecht-Al Jaber J.V | Parsons and Halcrow | January, 2007 |
42 | Soil Investigation in Al Wathba and Al Saad Geophysical Surveys | ADWEA (Abu Dhabi Water and
Electricity Authority) |
Hyder Consulting
Middle East Ltd |
January, 2007 |
43 | Shahama Saadiyat Free Way Geophysical Survey &
Execution of 02 Boreholes |
Al Geemi & Partners Contracting
Co. W.L.L |
Halcrow | June, 2007 |
44 | Jebel Hafeet Glacier Geophysical Survey | PNYG Company | EC Harris | September, 2007 |
45 | Construction of City of Light in Al Reem Island Geophysical Survey | Abu Dhabi Land General
Contracting |
National Engineering
Bureau |
October, 2007 |
46 | Al Etihad Village Al Raha Beach Geophysical Survey | ALDAR Laing O’Rourke | November, 2007 | |
47 | Golden Fish Tower Geophysical Crosshole Survey | Construction General
Contracting House Ltd |
Baynunah Laboratories | January, 2008 |
48 | Villa Collapse at Al Dhafra Geophysical Survey | QH ARMY BASE | March, 2008 | |
49 | Al Ain (Zakher) Geophysical Survey (ADWEA) | Abu Dhabi Sewerage Service Company (ADSSC) | Hyder Consulting
Middle East Ltd |
April, 2008 |
50 | Burj Dubai Development Plot No.41 Cross-hole Survey | Matrix Laboratory, Dubai | July, 2008 | |
51 | Ras Al Khader Geophysical Surveys | The Supervision Committee for the Presidential Palace | EWAN | July, 2008 |
52 | Mr. Ahmed Ali Al Sayegh Commercial & Residential Tower Geophysical Survey | Al FARA’A GENERAL
CONTRACTING CO.LLC |
August, 2008 | |
53 | MASDAR Development Geophysical Surveys | Abu Dhabi Future Energy Company Masdar | CH2MHILL | September, 2008 |
54 | ADSSC Sewer Tunnel Site Investigation Development
Geophysical Surveys |
Abu Dhabi Sewerage Service Company (ADSSC) | CH2MHILL | October, 2008 |
55 | AL Sowah Island Road and Bridge Development | AL MUBADALA | Atkins Partners & Overseas | December, 2008 |
56 | SARHA Project Geophysical Surveys on Plot No. P8A, Sector SE-47, Khalifa City A | Abu Dhabi Land General
Contracting |
EWAN | March, 2009 |
57 | ADSSC Sewer Tunnel Site Investigation Development
Geophysical Surveys |
Abu Dhabi Sewerage Service
Company (ADSSC) |
CH2MHILL | March to May, 2009 |
58 | ADSSC Sewer Tunnel Site Investigation Development
Geophysical Surveys ( Al Wathba Wetlands) |
Abu Dhabi Sewerage Service
Company (ADSSC) |
CH2MHILL | June to July, 2009 |
59 | Hayat Hotel Development Geophysical Surveys Al Ain Abu Dhabi | Royal Group | Clarkebond Engineering and
Management Consultant |
September to October,
2009 |
60 | Sas Al Nakhl Commercial Development Geophysical
Surveys, Abu Dhabi |
EWAN Architecture &
Engineering Consultancy |
October, 2009 | |
61 | Sector E-17, Salam Street Development Ground
Investigation Geophysical Surveys |
Royal Group; M/S Abu Dhabi
Land |
M/S EWAN Architecture &
Engineering Consultancy |
December, 2009 to
January 2010 |
62 | Construction of Sewerage Schemes for Al Shawamekh, Al Shahama, Al Bahya, Al Sader and Trunk Sewer of Falah and Shamkha, Stage 3 Geotechnical Investigation | ADSSC; Nael and Bin Harmal Hydro Export Est. (NBHH) | AECOM Limited | December, 2009 to
February 2010 |
63 | Contract No. N-4611/A New 400/132kv Grid Station at Bahia Geophysical Surveys | TRANSCO & Tosshiba
International |
Lahmeyer International | March to May 2010 |
64 | Contract No. ADSSC O-1637 Hameem Development – Zonescorp Construction of Sewerage Network and Pumping Station
|
ADSSC & ADMAC | Hyder Consulting | July to September
2010 |
65 |
Saadiyat Island Infrastructure Projects Contract No. Po27 Deep Utilities
|
TDIC & Al Naboodah | Parsons International | August to
September 2010 |
66 | Geophysical Investigation for Substation at Abu Dhabi
International Airport |
TRANSCO & Siemens | Energo Consult L.L.C (EC) | August to
September 2010 |
67 | Detecting Underground Utilities at Al Bateen Airport | Abu Dhabi Airport Company
(ADAC) |
Dar Al Handasah Abu Dhabi | November 2010
to May 2011 |
68 | Geophysical Survey for New Airbase at Abu Dhabi
International Airport |
GHQ Army Force | Dorsch Gruppe | January to March
2011 |
69 | Geophysical Investigation for Abu Dhabi Capital District Project | Abu Dhabi Urban Planning
Council |
Hyder Consulting and
Mouchel Group |
June 2011 to
March 2012 |