Completed Projects in SAUDI ARABIA |
||||
Item No. | Description | Client | Consultant |
Date |
1 | Topo Survey and Positioning for Jubail 3A Desalination Project | Saudi Water Partnership Company and Jazlah Water Desalination Company | EPC contractor : Abengoa and Tiejun
Marine subcontractor: Target Construction Saudi Company and Huaxi Ocean Ports & Marine Construction Contracting |
Nov 2021 to April 2022 |
2 | Cement Raw Materials Investigation, Soil Investigation and
Topographical Survey for Hail Cement Factory TURBA, HAIL Region, SAUDI ARABIA |
Chengdu Design and Research
Institute of Building Materials Industry Co. Ltd ,China & SINOMA |
HOLTEC
Consulting Private Limited , Indian |
May 2010 to
August 2010 |
3 | Cement Raw Materials Investigation, Soil Investigation and Topographical Survey for Al JOUF New Cement Production Line, TURAIF City, AL JOUF Region ,SAUDI ARABIA | Chengdu Design and Research Institute of Building Materials
Industry Co. Ltd, China & SINOMA |
AUSTROPLAN Austrian Engineering GmbH. | November 2011 to
February 2012 |
4 | Cement Raw Materials Investigation, Soil Investigation and Topographical Survey for TCC 5000 TPD Cement Plant Extension, DUBA, TABUK ,SAUDI ARABIA | Chengdu Design and Research
Institute of Building Materials Industry Co. Ltd, China & SINOMA |
AUSTROPLAN Austrian Engineering GmbH. | March 2013 to
June 2013 |
5 | Drilling three wells in Dhurma (800m depth each) | MODON | 11/10/2016 | |
6 | Drilling one wells (2015m) in Riyadh | NWC | 12/5/2015 | |
7 | Drilling one wells (1000m ) in Zulfi | MODON | 11/7/2015 | |
8 | Drilling two wells (1650m depth each ) in Kharj | MOWE | 2015-6 | |
9 | Drilling one well on each (five) water station at Qassim, Zulfi, Shaqra, Arar, Hafr al batin | MODON | 2015-1 | |
10 | Drilling three wells in Shaqra (in Sajer & Artway El Ser(600m) and One Well in Masheba (1300)m) | MOWE | 27/10/2014 | |
11 | Drilling two wells (750) m in Shaqra | MOWE | 10/10/2014 | |
12 | Drilling Shallow wells in Elb and Ghat | Shlumberger | 14/08/2014 | |
13 | Drilling one deep (1700m) at Manfuha plant in Riyadh | NWC RCBU | 28/01/2014 | |
14 | Drilling of (4) wells total, (2) wells 1600 m and (2) 1800m for Industrial Cities | DONGHO/MODON | 15/09/2013 | |
15 | Drilling of three wells (2400m) in Buwaib | NWC RCBU | 5/1/2012 | |
16 | Drilling of fifteen wells total, (8) wells 1700m in Riyadh and 7 Wells in Salboukh | SSEM/NWC | 15/09/2012 | |
17 | Drilling of two wells (2400m) in Buwaib | NWC | 9/6/2012 | |
18 | Drilling of one deep (2550m) deep in the Rub Al Khali Desert in Empty Quarter | GTZ | Doriner Consulting | 13/6/2012 |
19 | Drilling of three wells (2050m) in Salboukh | NWC | 20/02/2012 | |
20 | Drilling of one deep well (1700m) in Sudair | MOWE/ RIYADH | 8/1/2012 | |
21 | Drilling of four Wells (1700m) in Artawayiah | MOWE/ RIYADH | 13/03/2011 | |
22 | Drilling of two wells (2400m) in Buwaib | NWC | 14/8/2011 | |
23 | Drilling of one deep (1650m) at HRH Prince Sultan Bin Abdulaziz in Riyadh | National Water Company /RCBU | 5/8/2011 | |
24 | Drilling of (2) deep wells (2050m) wells (HQ636) at
Salboukh Field |
National Water Company /RCBU | 5/22/2010 | |
25 | Drilling of two deep wells (2200m) exploration wells | GTZ | Doriner Consulting | 01/09/2010 |
26 | Drilling of 4 deep wells (HQ4102) (03 wells of 2050m deep at Salboukh field and (01)well of 2400m at Buwaib field) | National Water Company /RCBU | 12/20/2009 | |
27 | Drilling of (11) eleven wells for Ministry of Water: 08 Wells of 1700m in Riyadh: 03 Wells of 2200m in Salboukh | Ministry of Water and Electricity | 8/17/2004 | |
28 | Drilling of four wells at 1700 m each ; Drilling of fifteen wells for Ministry of Water: for Ministry of Water and Electricity at
South West of Kharj City |
Ministry of Water and Electricity |
3/23/2005 |
|
29 |
Drilling of four wells at 1500 m deep as per MOWE specifications for Ministry of Water and Electricity ,Qassim Branch for Asiah Water Treatment Plant
|
Saudi Services for Electro Mechanic Works Co Ltd (SSEM ) |
7/12/2005 |
|
30 | Drilling of one deep well 1700m at Tamir for Ministry of Water, Water Treatment Project No.1 | Shibh Al-Jazira Contracting Co. | 15/10/2003 | |
31 | Drilling of one deep well 2300m at Janadriyah Farm, conforming to the specifications and standards of Ministry of Agriculture & Water | Crown Prince Private Affairs (Crown Prince Farm) | 01/07/2003 | |
32 | Drilling two deep wells 1800 m with pipes works at King Abdulaziz Miliatry Academy , Riyadh as per MODA /GDMW/
Project No 2/1/390B specifications & standards |
Sanie Drilling Co | 03/12/2002 | |
33 | Drilling of one deep well 1800m with transmission line at King Abdul Aziz Military Academy, Riyadh as per MODA/GDMW Project # 2/1/438 specifications | MODA / GDMW | 26/11/2002 | |
34 | Drilling of four water wells 1700m each with pipe line works at Al-Kharj conforming to the specification & standards of
Ministry of Agriculture & Water |
Ministry of Agriculture and Water | 11/06/2002 | |
35 | Drilling of one deep well 2100m near Exit 5 North of Riyadh,
as per the specifications |
Shas Company for Water Services | 18/07/2002 | |
36 | Drilling of one deep well 2200m for Ministry of Defense & Aviation Project # 13/12/1-3A2 as per MODA/GDMW
Project 13/12/1-3A2 at KKIA specifications & standards |
Al-Rashid Trading & Contracting Co. | 26/01/2002 | |
37 | Drilling of one deep well 2200m with pump and piping works, Al-Khozam Royal Palace, Riyadh conforming to the Ministry of Agriculture and Water specification and standards | Private Affairs of King Fahad Bin Abdul Aziz (King Fahad Bin Abdul Aziz’s Farm) | 15/10/2001 | |
38 | Drilling of one deep well 2300m at Janadriyah Farm, conforming to the specifications and standards of Ministry of Agriculture & Water
|
Crown Prince Private Affairs (Crown Prince Farm) | 26/01/2002 | |
39 |
Drilling of three water wells for Water & Sewage Authority, Riyadh conforming to the Ministry of Agriculture & Water standards & specifications
|
Sanie Drilling Co. | 11/12/2000 | |
40 | Drilling of four water wells at Shaikh Mansour Bin Shalhoub’s Farm, Dammam-Riyadh Highway as per specifications and standards | Shaikh Mansour Bin Shalhoub | 22/08/2000 | |
41 | Operation & Maintenance of eleven water wells at
Al-Johrah Farm, Jodah as per specifications and standards |
Agricultural Projects &
Development Co. |
01/04/2000 | |
42 | Drilling of six deep wells at Al-Johrah Farm, Jodah as per specifications and standards | Agricultural Projects &
Development Co. |
05/07/1998 | |
43 | Drilling of three water wells at Shaikh Motaib Al-Mandeel’s
Farm, Al-Shobah as per specifications and standards |
Shaikh Motaib Al-Mandeel | 05/02/1998 |