1 Soil Investigation and Topographical Survey for Flowing Gathering lines and Export Pipelines-BOC-1703 Basra Oil Company (BOC) CPP March to July 2021
2 Soil Investigation and Topographical Survey for HALFAYA Oilfield

Degas Station

Petro-China HALFAYA Branch And China Petroleum Pipeline Bureau May 2010 to

October 2010

3 Soil Investigation and Topographical Survey for Intermediate Pump

Station(IPS)-Al-HALFAYA Oilfield – Misson Governorate

Petro-China HALFAYA Branch And China Petroleum Pipeline Bureau June 2011 to

August 2011

4 Soil Investigation and Topographical Survey for Gas Export (GEXL)

-Al –HALFAYA Oilfield

Petro-China HALFAYA Branch And China Petroleum Pipeline Bureau October 2011 to

January 2012

5  

Soil Investigation and Topographical Survey for Infield Pipeline Works

for FCP , MAJNOON Oilfield Development

 

SHELL Iraq Petroleum Development BV and CPP May 2012 to

November 2012

6  

Soil Investigation and Topographical Survey for MAJNOON Oil Export

Pipeline Project

 

State Company for Oil Projects(SCOP)

And China Petroleum Pipeline Bureau

July 2012 to

December 2012

7  

Soil Investigation and Topographical Survey for HALFAYA Oil Export

Pipeline (280Km)

Missan Crude Oil Export Pipeline

 

Petro-China HALFAYA And China Petroleum Pipeline Bureau CPE and Mott MacDonald April 2012 to May

2013

8  

Soil Investigation and Topographical Survey for HALFAYA Project

Surface Facility Phase Two

 

Petro-China HALFAYA Branch April 2013 to

August 2013

9 Soil Investigation and Topographical Survey for BADRA -GHARRAF Oil Export Pipeline at BADRA Oil Field (165Km) Gazprom Neft Badra B.V. and CPP October 2012 to

March 2013

10 Soil Investigation and Topographical Survey for BADRA Well Gathering Project Gazprom Neft Badra B.V. and CPP November 2012 to

May 2013

11 Soil Investigation and Topographical Survey for GHARRAF Light

Oil Transportation System (LOTS)

Petronas Carigali Iraq Holding B.V.and CPP February 2013 to

October 2013

12 Soil Investigation, Topographical Survey and Piling Construction for

EPC of  3×25000 m3 Crude Oil Flow Tanks Project , RUMALA Oilfield

Petro-China RUMALA Branch and BP

 

CPPE and CPP

July 2013 to

August 2013

13 Soil Investigation and Topographical Survey for Well Pads and Oil Gathering System at the West QUMA Filed LUKOIL Oil Company

&

CPPE- TIANJING

October 2013 to

January 2014

14 Soil Investigation and Topographical Survey for Main Camp , BUT ,FAQI , ABU GHRAB and Pump Station Area Of MISSAN Oilfield CNOOC IRAQ LTD BVI &

MISSAN OIL FIELD

November 2011

to December 2011

15 Soil Investigation and Topographical Survey for Water Pipeline ,BUT and Degas Station , MISSAN Oilfield CNOOC IRAQ LTD BVI &

MISSAN OIL FIELD

May 2012 to

July 2013

16 Soil Investigation and Topographical Survey for BUZAN Crude Oil Export Pipeline CNOOC IRAQ LTD BVI &

MISSAN OILFIELD

August 2012 to

December 2012

17 Soil Investigation and Topographical Survey for Sewerage , Storm Water Networks ,

Uplift Stations and Treatment Plants ,Supplying and Implementing Treatment Plants for

HILLAH Sewerage Project (Al-Swab Al-KABBER and

Al-Swab Al-SAGHEER)/ BABIL Governorate

China National Electric Co. Ltd June 2012 to

October 2012

18 Soil Investigation and Topographical Survey and Piling Foundation Construction for WASSIT Power Plant Project –

4×330MW, KUT

China Hubei First Electric Power Construction Company June 2012 to

October 2012

19 Topographical Survey and Soil Investigation for New

Nassiriya Oil Depot Project

State Company for Oil Projects (SCOP),

Iraq and CPP & CPPE

June 2015 to

July 2016

20 Topographical Survey and Geotechnical Investigation for Salahading Power Plant in Mosul, Iraq

Funded by: Chinese Government

Ministry of Electricity Iraq &

EPC Contractor: China Machinery & Equipment Import & Export Corp. (CMEC)

2011